logo logo logo logo logo logo logo
  • Home
  • About Us
    • Our Timber
    • Literature
    • Certification
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2025 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joist
    • I-Joist
  • Timber Frame
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Verified Net Zero Climate Positive Carbon Status
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Acclaim Certificates
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
    • TRA Guides
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Health & Safety


Here you’ll find reference material regarding the Crendon Timber Engineering Health and Safety policies and procedures.

Feel free to browse the various documents, and download any that are relevant to your project.

Get in touch

Health & Safety Policy

Health & Safety Statement

SSIP Acclaim Accreditation

SSoW 13 – Safe Unloading of Inverted Trusses

SSoW 14 – Safe Unloading of Panels Using a Crane

SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers

SSoW 18 – Recommended method of manually unloading trusses less than 75kg

SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps

SSoW 20 – Safe Unloading of Trusses using a Crane

SSoW 21 – Safe Unloading of Trusses Using a Forklift

SSoW 27 – Recommended method of Offloading with a Lorry Mounted HIAB

TRA Gable Panel Guide

TRA Installation Guide

TRA Intro Storage Installation TR On Site

TRA Metal Joists

TRA Safety Infographic

TRA TR Handling Storage Installation Roadmap

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


Another Posi-Joist order completed, 100% On Time In Full by Crendon Washington f…

30th April 2025

We recently hosted a brilliant Clay Pigeon Shoot at Yeaveley Estate in Ashbourne…

28th April 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2025 Crendon Timber Engineering
Website by ads creative solutions