logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • Sponsorships
    • History
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joists
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
      • SSoW 27 – Safe Unloading with crane
    • TRA Guides
    • Quality Policy
  • Gallery
  • Newsletters
  • Charity of the Year
  • Careers
  • Contact

Latest News


Get in touch
Mewse takes the British 2025 MX1 Crown for Crendon FASTRACK Honda

1st September 2025

Mewse takes the British 2025 MX1 Crown for Crendon FASTRACK Honda

Scissor-type Roof Truss recently supplied to Bellway Essex for their Sales Centre at Rivenhall

28th August 2025

Scissor-type Roof Truss recently supplied to Bellway Essex for their Sales Centre at Rivenhall

Mewse wins again for Crendon FASTRACK Honda at red-hot Landrake

11th August 2025

Mewse wins again for Crendon FASTRACK Honda at red-hot Landrake

It’s a pleasure to receive positive feedback, thanks to our delivery teams for going the extra mile.

7th August 2025

It’s a pleasure to receive positive feedback, thanks to our delivery teams for going the extra mile.

We were delighted to welcome the Next Generation team from Bradford Building Supplies to our Glastonbury branch.

22nd July 2025

We were delighted to welcome the Next Generation team from Bradford Building Supplies to our Glastonbury branch.

Mewse maintains perfect British championship season for Crendon FASTRACK Honda

21st July 2025

Mewse maintains perfect British championship season for Crendon FASTRACK Honda

Double Win at Blaxhill highlights great day for Crendon FASTRACK Honda in British MX1 Championship

16th June 2025

Double Win at Blaxhill highlights great day for Crendon FASTRACK Honda in British MX1 Championship

Learning Disability and Autism (LDA) Unit at Langdon Hospital Case Study

10th June 2025

Learning Disability and Autism (LDA) Unit at Langdon Hospital Case Study

Crendon Timber Engineering have been Awarded their Supplier of the Quarter Q1 2025 by Taylor Wimpey.

4th June 2025

Crendon Timber Engineering have been Awarded their Supplier of the Quarter Q1 2025 by Taylor Wimpey.

The Crendon Summer 2025 newsletter is now available to read.

19th May 2025

The Crendon Summer 2025 newsletter is now available to read.

Tough Crendon FASTRACK Honda Mewse keeps perfect record in British championship

19th May 2025

Tough Crendon FASTRACK Honda Mewse keeps perfect record in British championship

Another Posi-Joist order completed, 100% On Time In Full by Crendon Washington for a major project in Morpeth, Northumberland.

30th April 2025

Another Posi-Joist order completed, 100% On Time In Full by Crendon Washington for a major project in Morpeth, Northumberland.

« Prev 1 2 3 4 5 … 25 Next »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


A beautifully designed and manufactured set of curved Roof Trusses for a customer in Gloucester, expertly designed by our team at Bridgend to meet the exact project requirements, combining structural integrity with stunning visual impact. 

Jan 7, 2026

We’re back and ready to help you build smarter, faster, and safer, with our full range of designed and manufactured timber engineered solutions.

Jan 6, 2026

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2026 Crendon Timber Engineering

Website by ads creative solutions