Full load of Firesafe Posi-Joists treated with IWS-FR with secondary nailing for a new accommodation block for a project in West Sussex

Metal frame being nailed to timber panels

Enquire

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Drop files here or
Max. file size: 100 MB.