Latest News

Stay up to date with the latest developments from Crendon Timber Engineering. Our Latest News section covers company updates, project highlights, industry insights and product innovations, helping you stay informed.

Roof of a building under construction made up of Roof Trusses
As part of our continued effort towards a sustainable future, our Crendon Washington branch has taken delivery of a new C4000ET electric multi-directional fork truck, which the team have put to good use immediately.

9 September 2024

As part of our continued effort towards a sustainable future, our Crendon Washington branch has taken delivery of a new C4000ET electric multi-directional fork truck, which the team have put to good use immediately.

Our Crendon Timber Engineering Washington branch recently made a Posi-Joist delivery to St James Park, the home of Newcastle United Football.

5 September 2024

Our Crendon Timber Engineering Washington branch recently made a Posi-Joist delivery to St James Park, the home of Newcastle United Football.

We are delighted to advise our Newquay branch has been awarded STA Gold Status.

30 August 2024

We are delighted to advise our Newquay branch has been awarded STA Gold Status.

Crendon Timber Engineering are delighted to announce that we have now received our Posi-Joist EPD Certificate which we believe is a first in the Timber Engineering Industry.

20 August 2024

Crendon Timber Engineering are delighted to announce that we have now received our Posi-Joist EPD Certificate which we believe is a first in the Timber Engineering Industry.

100% On Time In Full Timber Frame Garden Room Project.

23 July 2024

100% On Time In Full Timber Frame Garden Room Project.

Another Full Load of Posi-Joist Floor Cassettes being delivered for the next phase of a large new build project in Bishops Stortford.

1 July 2024

Another Full Load of Posi-Joist Floor Cassettes being delivered for the next phase of a large new build project in Bishops Stortford.

Taylor Wimpey Production Management and Site Management Team Visit Long Crendon.

7 June 2024

Taylor Wimpey Production Management and Site Management Team Visit Long Crendon.

Woodman, our brand new rigid lorry, leaving the Glastonbury branch on its first delivery, On Time In Full, for a site in Bridgwater.

29 April 2024

Woodman, our brand new rigid lorry, leaving the Glastonbury branch on its first delivery, On Time In Full, for a site in Bridgwater.

Many congratulations to the Crendon Glastonbury team for passing 1000 days without a Lost Time Accident.

19 April 2024

Many congratulations to the Crendon Glastonbury team for passing 1000 days without a Lost Time Accident.

Our new Hundegger saw is now operational at our Glastonbury branch, cutting I Joists. The in-feed for this saw is able to take lengths up to 13.2m.

12 April 2024

Our new Hundegger saw is now operational at our Glastonbury branch, cutting I Joists. The in-feed for this saw is able to take lengths up to 13.2m.

5 April 2024

We offer a 5-day FASTRACK delivery service. This means we supply your timber engineering products within 5-days from receipt of signed drawings.

Maiden delivery this week for our latest new trailer unit with a full load of 11m Top Hat Attic Trusses, all delivered 100% On Time In Full for an attic extension project in Eastwood Nottingham.

26 March 2024

Maiden delivery this week for our latest new trailer unit with a full load of 11m Top Hat Attic Trusses, all delivered 100% On Time In Full for an attic extension project in Eastwood Nottingham.