Latest News


Crendon Timber Engineering is deeply saddened at the news of the death of Her Majesty, Queen Elizabeth II. Our condolences are with the Royal Family at this difficult time.

9th September 2022

Crendon Timber Engineering is deeply saddened at the news of the death of Her Majesty, Queen Elizabeth II. Our condolences are with the Royal Family at this difficult time.

Full load of Posi-Joist Metal Web Joists and 22mm protect TG4 decking all delivered 100% On Time In Full for a new development in East Sussex.

5th September 2022

Full load of Posi-Joist Metal Web Joists and 22mm protect TG4 decking all delivered 100% On Time In Full for a new development in East Sussex.

Full load of Trusses and Spandrel Panels delivered 100% On Time In Full for a housing site in Acle.

5th September 2022

Full load of Trusses and Spandrel Panels delivered 100% On Time In Full for a housing site in Acle.

Podium success for Searle in MX Nationals finale

5th September 2022

Podium success for Searle in MX Nationals finale

Another full load of Posi-Joists ready for delivery from Crendon 100% on time in full for a new housing development in Bury St Edmunds

22nd August 2022

Another full load of Posi-Joists ready for delivery from Crendon 100% on time in full for a new housing development in Bury St Edmunds

Posi-Rafters being manufactured this week with Angled Eave and Ridge Detail for a Housing Development in Great Ellingham

8th August 2022

Posi-Rafters being manufactured this week with Angled Eave and Ridge Detail for a Housing Development in Great Ellingham

Another Win for Crendon FASTRACK Honda MX1!

1st August 2022

Another Win for Crendon FASTRACK Honda MX1!

The Maiden Delivery this week for our Latest addition to our HGV Fleet “ Rooferman” with a Full Load of Trusses for a New Housing Site in Ely

29th July 2022

The Maiden Delivery this week for our Latest addition to our HGV Fleet “ Rooferman” with a Full Load of Trusses for a New Housing Site in Ely

16m 3 Ply Factory Nailed Girder Trusses in production this week at Crendon East Harling all with bespoke designed metalwork fixings for New Stores, Training and Educational Facility in Haddenham

15th July 2022

16m 3 Ply Factory Nailed Girder Trusses in production this week at Crendon East Harling all with bespoke designed metalwork fixings for New Stores, Training and Educational Facility in Haddenham

Searle tops the Fatcat British championship podium

11th July 2022

Searle tops the Fatcat British championship podium

Another Full Load of 421 mm Deep , 8m Span Posi-Joists for a large Flat Roof on a Block of Flats all Delivered 100% On Time In Full from Crendon, Long Crendon Branch

6th July 2022

Another Full Load of 421 mm Deep , 8m Span Posi-Joists for a large Flat Roof on a Block of Flats all Delivered 100% On Time In Full from Crendon, Long Crendon Branch

Crendon Peterborough Speedway – PANTHERS 46 KING’S LYNN 44

5th July 2022

Crendon Peterborough Speedway – PANTHERS 46 KING’S LYNN 44