logo logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Certification
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2025 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joist
    • I-Joist
  • Timber Frame
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Verified Net Zero Climate Positive Carbon Status
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Certificates
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
    • TRA Guides
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Latest News


Get in touch
Full load of Trusses and Spandrel Panels delivered 100% On Time In Full for a housing site in Acle.

5th September 2022

Full load of Trusses and Spandrel Panels delivered 100% On Time In Full for a housing site in Acle.

Podium success for Searle in MX Nationals finale

5th September 2022

Podium success for Searle in MX Nationals finale

Another full load of Posi-Joists ready for delivery from Crendon 100% on time in full for a new housing development in Bury St Edmunds

22nd August 2022

Another full load of Posi-Joists ready for delivery from Crendon 100% on time in full for a new housing development in Bury St Edmunds

Posi-Rafters being manufactured this week with Angled Eave and Ridge Detail for a Housing Development in Great Ellingham

8th August 2022

Posi-Rafters being manufactured this week with Angled Eave and Ridge Detail for a Housing Development in Great Ellingham

Another Win for Crendon FASTRACK Honda MX1!

1st August 2022

Another Win for Crendon FASTRACK Honda MX1!

The Maiden Delivery this week for our Latest addition to our HGV Fleet “ Rooferman” with a Full Load of Trusses for a New Housing Site in Ely

29th July 2022

The Maiden Delivery this week for our Latest addition to our HGV Fleet “ Rooferman” with a Full Load of Trusses for a New Housing Site in Ely

16m 3 Ply Factory Nailed Girder Trusses in production this week at Crendon East Harling all with bespoke designed metalwork fixings for New Stores, Training and Educational Facility in Haddenham

15th July 2022

16m 3 Ply Factory Nailed Girder Trusses in production this week at Crendon East Harling all with bespoke designed metalwork fixings for New Stores, Training and Educational Facility in Haddenham

Searle tops the Fatcat British championship podium

11th July 2022

Searle tops the Fatcat British championship podium

Another Full Load of 421 mm Deep , 8m Span Posi-Joists for a large Flat Roof on a Block of Flats all Delivered 100% On Time In Full from Crendon, Long Crendon Branch

6th July 2022

Another Full Load of 421 mm Deep , 8m Span Posi-Joists for a large Flat Roof on a Block of Flats all Delivered 100% On Time In Full from Crendon, Long Crendon Branch

Crendon Peterborough Speedway – PANTHERS 46 KING’S LYNN 44

5th July 2022

Crendon Peterborough Speedway – PANTHERS 46 KING’S LYNN 44

Acquisition of the David Smith St Ives & Glulam Timber Engineering Businesses

1st July 2022

Acquisition of the David Smith St Ives & Glulam Timber Engineering Businesses

Crendon Awarded Supplier of the Year by Keepmoat Homes

28th June 2022

Crendon Awarded Supplier of the Year by Keepmoat Homes

« Prev 1 … 13 14 15 16 17 … 23 Next »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


Great to see our new HIAB rigid truck ‘The Logfather’, out and about from o…

8th September 2025

Mewse takes the British 2025 MX1 Crown for Crendon FASTRACK Honda

1st September 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2025 Crendon Timber Engineering
Website by ads creative solutions