logo logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2025 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joist
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Verified Net Zero Climate Positive Carbon Status
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
    • TRA Guides
    • Quality Policy
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Latest News


Get in touch
Full load of Flat Top and Box Trusses for a commercial Supply & Fit Project all loaded for delivery 100% On Time In Full

13th October 2021

Full load of Flat Top and Box Trusses for a commercial Supply & Fit Project all loaded for delivery 100% On Time In Full

Crendon FASTRACK Peterborough race into the Speedway Grand Final

8th October 2021

Crendon FASTRACK Peterborough race into the Speedway Grand Final

Crendon FASTRACK Honda 2021 MX British Champions Season Review

8th October 2021

Crendon FASTRACK Honda 2021 MX British Champions Season Review

Crendon Timber Engineering win the Structural Timber Systems Supplier of the Year Award at the 2021 TTJ Awards

5th October 2021

Crendon Timber Engineering win the Structural Timber Systems Supplier of the Year Award at the 2021 TTJ Awards

Mr Rooftastic making another 100% On Time In Full Delivery

3rd October 2021

Mr Rooftastic making another 100% On Time In Full Delivery

Semi Final 1st Leg Win for FASTRACK Crendon Peterborough

29th September 2021

Semi Final 1st Leg Win for FASTRACK Crendon Peterborough

Top of the League for Crendon Peterborough Speedway!

24th September 2021

Top of the League for Crendon Peterborough Speedway!

Crendon FASTRACK Honda WIN the 2021 British MX 1 Championship

13th September 2021

Crendon FASTRACK Honda WIN the 2021 British MX 1 Championship

A complex 15m Span Mono Truss Roof for a new Office/Commercial Building in Norwich all delivered 100% On Time in Full this week

13th September 2021

A complex 15m Span Mono Truss Roof for a new Office/Commercial Building in Norwich all delivered 100% On Time in Full this week

Thank you to everyone at Crendon for your donation to the East Anglia’s Children’s Hospices

6th September 2021

Thank you to everyone at Crendon for your donation to the East Anglia’s Children’s Hospices

Another away win for The Peterborough FASTRACK Crendon Speedway Team

3rd September 2021

Another away win for The Peterborough FASTRACK Crendon Speedway Team

Another Two Full Loads of Posi-Joists and Roof Trusses

26th August 2021

Another Two Full Loads of Posi-Joists and Roof Trusses

« Prev 1 … 18 19 20 21 22 … 24 Next »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


More recognition for our award winning project.

7th October 2025

The Harling 10K Run took place on Sunday 21st September.

1st October 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2025 Crendon Timber Engineering
Website by ads creative solutions