The second of 4 full loads of PS16 (421mm deep) Posi-Joists on its way

The second of 4 full loads of PS16 (421mm deep) Posi-Joists on its way from our Long Crendon branch to a site in Hertford.

To achieve the design requirements the joists have a special timber diagonal web and multi block detail one end.

This exciting project sees the regeneration of an existing multi storey car park into a new apartment block.

 

Enquire

This field is for validation purposes and should be left unchanged.