logo logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2025 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joist
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Verified Net Zero Climate Positive Carbon Status
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
    • TRA Guides
    • Quality Policy
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Crendon Timber Engineering is deeply saddened at the news of the death of Her Majesty, Queen Elizabeth II. Our condolences are with the Royal Family at this difficult time.

by adsoxford | 9th September 2022

Full load of Posi-Joist Metal Web Joists and 22mm protect TG4 decking all delivered 100% On Time In Full for a new development in East Sussex.

by adsoxford | 5th September 2022

Full load of Trusses and Spandrel Panels delivered 100% On Time In Full for a housing site in Acle.

by adsoxford | 5th September 2022

Podium success for Searle in MX Nationals finale

by adsoxford | 5th September 2022

Another full load of Posi-Joists ready for delivery from Crendon 100% on time in full for a new housing development in Bury St Edmunds

by adsoxford | 22nd August 2022

« Older Entries
Next Entries »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


The Crendon Autumn 2025 newsletter is now available to read.

24th October 2025

We’re thrilled to announce that Crendon Timber Engineering has received the  

16th October 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2025 Crendon Timber Engineering
Website by ads creative solutions