logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • Crendon FASTRACK Honda
    • History
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joists
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
      • SSoW 27 – Safe Unloading with crane
    • A Customer Guide for Manually Unloading Trusses less than 75kg
    • TRA Guides
    • Quality Policy
  • Gallery
  • Newsletters
  • Charity of the Year
  • Careers
  • Contact

Crendon Timber Engineering Awarded 2022 Supply Chain Partner of the Year by Lovell Partnerships

by adsoxford | 3rd June 2022

Full load of 11m Span 400mm Deep I Joists all being delivered 100% On Time In Full this week for a new Holiday Park Development at Clacton On Sea

by adsoxford | 31st May 2022

Our latest New Posi Joist Metal Web Press has been installed this week at our Glastonbury branch

by adsoxford | 26th May 2022

Another On Time In Full delivery for a Supply & Fit contract in Cirencester. All Pre Slung ready for crane offload.

by adsoxford | 26th May 2022

Posi-Joist Floors and Posi-Rafter Roofs all Delivered 100% On Time In Full for a High Quality New Housing Development in Great Ellingham, Norfolk

by adsoxford | 25th May 2022

« Older Entries
Next Entries »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


📍 We’re at The Welsh Construction Show today! 

28th April 2026

We’re delighted to announce that Steve Hoult and Crendon Castleford have been named Safety Champion of the Year at the 2026 Trussed Rafter Association Roofscape Design Awards 👏

24th April 2026

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2026 Crendon Timber Engineering

Website by ads creative solutions