logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • Crendon FASTRACK Honda
    • History
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joists
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
      • SSoW 27 – Safe Unloading with crane
    • A Customer Guide for Manually Unloading Trusses less than 75kg
    • TRA Guides
    • Quality Policy
  • Gallery
  • Newsletters
  • Charity of the Year
  • Careers
  • Contact

Another Full Load of Posi-Joist Floor Cassettes being delivered for the next phase of a large new build project in Bishops Stortford.

by adsoxford | 1st July 2024

Taylor Wimpey Production Management and Site Management Team Visit Long Crendon.

by adsoxford | 7th June 2024

Woodman, our brand new rigid lorry, leaving the Glastonbury branch on its first delivery, On Time In Full, for a site in Bridgwater.

by adsoxford | 29th April 2024

Many congratulations to the Crendon Glastonbury team for passing 1000 days without a Lost Time Accident.

by adsoxford | 19th April 2024

Our new Hundegger saw is now operational at our Glastonbury branch, cutting I Joists. The in-feed for this saw is able to take lengths up to 13.2m.

by adsoxford | 12th April 2024

« Older Entries
Next Entries »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


📍 We’re at The Welsh Construction Show today! 

28th April 2026

We’re delighted to announce that Steve Hoult and Crendon Castleford have been named Safety Champion of the Year at the 2026 Trussed Rafter Association Roofscape Design Awards 👏

24th April 2026

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2026 Crendon Timber Engineering

Website by ads creative solutions