A recent progress visit shows good momentum on-site as this affordable housing development continues to take shape.

A building with scaffolding on it

39 affordable, energy-efficient homes at Clay Park, Dartington, delivered to the highest standard of performance (EPC A) on behalf of the client Aster Group for Clayewater Homes Ltd.

A building with scaffolding on it

The social rented homes are constructed with reduced embodied carbon and include air source heat pumps and solar PV panels, helping residents to lower their energy use and utility bills.

A timber frame wall

Crendon Timber Frame designed, manufactured and installed the full Timber superstructure using Crendon’s Closed Panel Timber Frame system, with Gable and Spandrel Panels supplied by Crendon Newquay and the Roof Trusses supplied by Crendon Bridgend. The project was delivered through strong collaboration, ensuring a coordinated approach to design, manufacture and installation.

Enquire

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Drop files here or
Max. file size: 1 GB.