Latest News


100% On Time In Full Timber Frame Garden Room Project.

23rd July 2024

100% On Time In Full Timber Frame Garden Room Project.

Another Full Load of Posi-Joist Floor Cassettes being delivered for the next phase of a large new build project in Bishops Stortford.

1st July 2024

Another Full Load of Posi-Joist Floor Cassettes being delivered for the next phase of a large new build project in Bishops Stortford.

Taylor Wimpey Production Management and Site Management Team Visit Long Crendon.

7th June 2024

Taylor Wimpey Production Management and Site Management Team Visit Long Crendon.

News: Towards a Sustainable Future

5th June 2024

News: Towards a Sustainable Future

Voting is now OPEN for the TTJ Structural Timber Systems Supplier of the Year award for 2024.

29th May 2024

Voting is now OPEN for the TTJ Structural Timber Systems Supplier of the Year award for 2024.

The Crendon Timber Engineering, Bridgend team of Mark Selway, Darren Hever and Kyle Richards are attending The Welsh Construction Show on Wednesday 15th May 2024 at Cardiff City Stadium.

9th May 2024

The Crendon Timber Engineering, Bridgend team of Mark Selway, Darren Hever and Kyle Richards are attending The Welsh Construction Show on Wednesday 15th May 2024 at Cardiff City Stadium.

Woodman, our brand new rigid lorry, leaving the Glastonbury branch on its first delivery, On Time In Full, for a site in Bridgwater.

29th April 2024

Woodman, our brand new rigid lorry, leaving the Glastonbury branch on its first delivery, On Time In Full, for a site in Bridgwater.

Our new Product Range brochure is available

26th April 2024

Our new Product Range brochure is available

Many congratulations to the Crendon Glastonbury team for passing 1000 days without a Lost Time Accident.

19th April 2024

Many congratulations to the Crendon Glastonbury team for passing 1000 days without a Lost Time Accident.

Our new Hundegger saw is now operational at our Glastonbury branch, cutting I Joists. The in-feed for this saw is able to take lengths up to 13.2m.

12th April 2024

Our new Hundegger saw is now operational at our Glastonbury branch, cutting I Joists. The in-feed for this saw is able to take lengths up to 13.2m.

We offer a 5-day FASTRACK delivery service.  This means we supply your timber engineering products within 5-days from receipt of signed drawings.

5th April 2024

We offer a 5-day FASTRACK delivery service. This means we supply your timber engineering products within 5-days from receipt of signed drawings.

Maiden delivery this week for our latest new trailer unit with a full load of 11m Top Hat Attic Trusses, all delivered 100% On Time In Full for an attic extension project in Eastwood Nottingham.

26th March 2024

Maiden delivery this week for our latest new trailer unit with a full load of 11m Top Hat Attic Trusses, all delivered 100% On Time In Full for an attic extension project in Eastwood Nottingham.