logo logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2025 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joist
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Verified Net Zero Climate Positive Carbon Status
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
    • TRA Guides
    • Quality Policy
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Latest News


Get in touch
Crendon FASTRACK Peterborough are through to the end of season Play Offs with a fantastic 49 vs 41 win over Wolverhampton

24th August 2021

Crendon FASTRACK Peterborough are through to the end of season Play Offs with a fantastic 49 vs 41 win over Wolverhampton

Double Podium Joy for Crendon Fastrack Honda

18th August 2021

Double Podium Joy for Crendon Fastrack Honda

Full load of Double Apex Box Beam 14m Long Span Trusses all delivered this week

16th August 2021

Full load of Double Apex Box Beam 14m Long Span Trusses all delivered this week

Crendon Timber Engineering Shortlisted for the Structural Timber Systems Supplier of the Year at The TTJ Awards 2021 Ceremony.

12th August 2021

Crendon Timber Engineering Shortlisted for the Structural Timber Systems Supplier of the Year at The TTJ Awards 2021 Ceremony.

Another Win for the Crendon FASTRACK Panthers Speedway Team

11th August 2021

Another Win for the Crendon FASTRACK Panthers Speedway Team

Crendon FASTRACK Honda stay top of the British MX Championship

9th August 2021

Crendon FASTRACK Honda stay top of the British MX Championship

Crendon FASTRACK Honda Dominate MX Nationals Podium

27th July 2021

Crendon FASTRACK Honda Dominate MX Nationals Podium

Top of the League for Crendon FASTRACK Peterborough Speedway Team!

25th July 2021

Top of the League for Crendon FASTRACK Peterborough Speedway Team!

Crendon FASTRACK HGVs fully loaded with Roof Trusses and Spandrel Panels

16th July 2021

Crendon FASTRACK HGVs fully loaded with Roof Trusses and Spandrel Panels

Crendon FASTRACK Peterborough Top of the League

4th July 2021

Crendon FASTRACK Peterborough Top of the League

Our first Posi-Joist Order manufactured this week at our new Castleford Production Facility

30th June 2021

Our first Posi-Joist Order manufactured this week at our new Castleford Production Facility

Fifth win in a row for the Crendon FASTRACK Peterborough Speedway Team

29th June 2021

Fifth win in a row for the Crendon FASTRACK Peterborough Speedway Team

« Prev 1 … 19 20 21 22 23 24 Next »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


More recognition for our award winning project.

7th October 2025

The Harling 10K Run took place on Sunday 21st September.

1st October 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2025 Crendon Timber Engineering
Website by ads creative solutions