logo logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2026 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joists
    • I-Joist
  • Timber Frame
  • Certification
    • Health & Safety Certificates
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
      • SSoW 27 – Safe Unloading with crane
    • TRA Guides
    • Quality Policy
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Latest News


Get in touch
Crendon Timber Engineering Awarded 2022 Supply Chain Partner of the Year by Lovell Partnerships

3rd June 2022

Crendon Timber Engineering Awarded 2022 Supply Chain Partner of the Year by Lovell Partnerships

Full load of 11m Span 400mm Deep I Joists all being delivered 100% On Time In Full this week for a new Holiday Park Development at Clacton On Sea

31st May 2022

Full load of 11m Span 400mm Deep I Joists all being delivered 100% On Time In Full this week for a new Holiday Park Development at Clacton On Sea

Hawk Racing welcomes Crendon Timber Engineering as title sponsor for Isle of Man TT

30th May 2022

Hawk Racing welcomes Crendon Timber Engineering as title sponsor for Isle of Man TT

Searle’s stunning podium run continues

30th May 2022

Searle’s stunning podium run continues

Crendon FASTRACK Honda Rider Tommy Searle, latest race win video, now leading the 2022 MX1 British Championship

27th May 2022

Crendon FASTRACK Honda Rider Tommy Searle, latest race win video, now leading the 2022 MX1 British Championship

Our latest New Posi Joist Metal Web Press has been installed this week at our Glastonbury branch

26th May 2022

Our latest New Posi Joist Metal Web Press has been installed this week at our Glastonbury branch

Another On Time In Full delivery for a Supply & Fit contract in Cirencester. All Pre Slung ready for crane offload.

26th May 2022

Another On Time In Full delivery for a Supply & Fit contract in Cirencester. All Pre Slung ready for crane offload.

Posi-Joist Floors and Posi-Rafter Roofs all Delivered 100% On Time In Full for a High Quality New Housing Development in Great Ellingham, Norfolk

25th May 2022

Posi-Joist Floors and Posi-Rafter Roofs all Delivered 100% On Time In Full for a High Quality New Housing Development in Great Ellingham, Norfolk

Crendon FASTRACK Super Searle scorches to British championship double win

23rd May 2022

Crendon FASTRACK Super Searle scorches to British championship double win

Crendon Fastrack Honda’s Nicholls Announces Retirement After Shoulder Injury

18th May 2022

Crendon Fastrack Honda’s Nicholls Announces Retirement After Shoulder Injury

Crendon FASTRACK’s Searle and Nicholls storm British championship podium

9th May 2022

Crendon FASTRACK’s Searle and Nicholls storm British championship podium

Double MX Nationals podium for Crendon Fastrack Honda

3rd May 2022

Double MX Nationals podium for Crendon Fastrack Honda

« Prev 1 … 16 17 18 19 20 … 25 Next »

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


At this year’s TRA Roofscape Design Awards, Jack West-Jordan our Crendon East Harling Branch Manager was named Career Development Champion of the Year 2025

Apr 17, 2025

We’re incredibly proud to announce that Crendon Timber Engineering has won three prestigious awards at the Trussed Rafter Association (TRA) Roofscape Design Awards 2025

Apr 11, 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © [year] Crendon Timber Engineering
Website by ads creative solutions