logo logo logo logo logo logo logo
  • Home
  • About Us
    • Case Studies
    • Our Timber
    • Literature
    • Certification
    • Latest News
    • History
    • Honda MX Team
    • Honda Arenacross Team
    • 2025 Charity
  • Products
    • Roof Trusses
    • Feature Truss
    • Gable Panels
    • Spandrel Panels
    • Posi-Attic
    • Porches
    • Glulam
    • Dormers
    • Timber Frame
    • Roof & Floor Cassettes
    • Posi-Joist
    • I-Joist
  • Timber Frame
  • Environment
    • PEFC Policy Statement
    • Environmental Policy Statement
    • PEFC Certificate
    • Verified Net Zero Climate Positive Carbon Status
    • Supply Chain Sustainability School Crendon Case Study
    • Supply Chain Sustainability School Badge
    • Towards a Sustainable Future
  • Supply & Fit
  • Customer Service
    • FASTRACK
    • Supply & Fit
    • Contractors
    • Housebuilders
    • Local Builders
    • Merchants
    • Self Builders
    • Order Acknowledgement Form
    • OTIF Archive
    • Testimonials
  • Health & Safety
    • Health & Safety Policy
    • Health & Safety Statement
    • Certificates
    • Safe Systems of Work (SSoW Safe Methods of Unloading)
      • SSoW 13 – Safe Unloading of Inverted Trusses
      • SSoW 14 – Safe Unloading of Panels Using a Crane
      • SSoW 17 – Recommended method of manually unloading – Metal Web Joist, I-Joist and Ancillary Timbers
      • SSoW 18 – Recommended method of manually unloading trusses less than 75kg
      • SSoW 19 – Safe Unloading of Panels with Forklift and Short Straps
      • SSoW 20 – Safe Unloading of Trusses using a Crane
      • SSoW 21 – Safe Unloading of Trusses Using a Forklift
    • TRA Guides
  • Gallery
  • Contact
  • Latest News
  • Crendon Newsletters
  • Careers

Latest News


Get in touch
  • Previous
  • Next

30th June 2021

Our first Posi-Joist Order manufactured this week at our new Castleford Production Facility

29th June 2021

Fifth win in a row for the Crendon FASTRACK Peterborough Speedway Team

25th June 2021

Two full loads of 14m Mono Trusses delivered

23rd June 2021

Crendon FASTRACK Peterborough Go Top of the League

23rd June 2021

Another 80 Bed Care Home Truss Roof installation

21st June 2021

Crendon FASTRACK Honda Rider Tommy Searle Extends British MX Championship Lead

15th June 2021

Three wins in a row for the Crendon FASTRACK Peterborough Team

10th June 2021

Crendon FASTRACK Panthers Speedway Team celebrate a great 58:32 win over Kings Lynn

10th June 2021

Crendon FASTRACK Honda continue to lead the British Motocross Championship

4th June 2021

80 Bedroom Care Home Roof

1st June 2021

Another Full Load of Roof Trusses Delivered

31st May 2021

Crendon FASTRACK Peterborough Panthers – East of England Arena opener

24th May 2021

Tommy Searle takes British MX1 championship lead for Crendon Fastrack Honda

11th May 2021

Podium debut for Crendon Fastrack Honda

6th May 2021

Update on current Worldwide Timber Supply and Cost Price Increase Challenges

29th March 2021

Two New Specialist Truss 40 Foot Artic Trailer Units

26th March 2021

Green light for Crendon Fastrack Honda race debut

15th March 2021

Crendon – March 2021 Brochure

    Next Previous

01844 201020
enquiries@crendon.co.uk

Navigation


Home

About

Products

Gallery

Contact

Latest News


Crendon Timber Engineering have been Awarded their Supplier of the Quarter Q1 20…

4th June 2025

The Crendon Summer 2025 newsletter is now available to read.

19th May 2025

Links


Careers

Privacy Policy

Terms & Conditions

Gender Pay Gap Report

Head Office, Drakes Drive, Long Crendon, Buckinghamshire HP18 9BA
Company No 01992573 Registered in England & Wales | VAT No. 301 2435 64

Registered Address: C/O Wyckham Blackwell, Old Station Road, Hampton in Arden, Solihull, Warwickshire, England, B92 0HB

Copyright © 2025 Crendon Timber Engineering
Website by ads creative solutions